Sixteen recent municipal and private utility projects across Arizona — water mains, force mains, pipeline rehabilitation, lift stations, and plant capacity expansions.

19th Ave & Hatcher Urban Art Installation
City of Phoenix

19th Ave & Hatcher Urban Art Installation

19th Ave and Hatcher Road Urban Art Installation City of Phoenix TFC recently completed an urban beautification project at the intersection of 19th Avenue and Hatcher Road in Phoenix.

View case →
Hayden 101 Waterline Replacement
Willmeng Construction

Hayden 101 Waterline Replacement

Working with Willmeng Construction to Install approximately of 2700 LF of 16" DIP from just East of N 73rd Place along the Mayo Blvd alignment East past the Miller Road alignment to replace an existing 16" Steel Cylinder Watermain that conflicts with future de

View case →
Wastewater Collection System DIP Rehabilitation
City of Tempe

Wastewater Collection System DIP Rehabilitation

Rehabilitation of (22) Ductile Iron Pipe (DIP)segments, involving the installation of CIPP liner into the interior of the pipes.

View case →
Victory Sewer Offsite Sewer
The Base Phase 1, LLC

Victory Sewer Offsite Sewer

Willmeng Construction Project Cost: $2.366 million Scope:

View case →
Gilbert System Wide Force Main Rehabilitation
Town of Gilbert

Gilbert System Wide Force Main Rehabilitation

Rehabilitation of approximately 22 miles of force mains across 15 lift stations throughout Gilbert.

View case →
Hardy Drive Diversion Manhole Renovation
City of Tempe

Hardy Drive Diversion Manhole Renovation

Awarded through competitive bid with Caliente Construction under City of Tempe General Construction Services JOC.

View case →
Forcemain Repair — Western Canal
Town of Gilbert

Forcemain Repair — Western Canal

Engaged under Town of Gilbert's emergency procurement JOC due to 18" DIP wastewater forcemain failure.

View case →
Tempe Wastewater Collection System
City of Tempe

Tempe Wastewater Collection System

Partnered with Insituform Technologies on a Design-d-Build project for the City of Tempe.

View case →
Peoria Logistics Park
Contracted under GC

Peoria Logistics Park

Worked under a General Contractor for the Peoria Logistics Park, a 158-acre industrial park in southern Peoria, Arizona.

View case →
San Tan Lift Station & Force Main Repair
Town of Gilbert

San Tan Lift Station & Force Main Repair

JOC for Town of Gilbert Retrofit / rehab of existing lift station including bypass pumping Precon services from "napkin plans" with GMP Public outreach and coordination MOPO / LOTO coordination Confined space entry HDPE butt fusion welding

View case →
TOQC — Power Rd 42" Concrete Pipe Rehab
Town of Queen Creek

TOQC — Power Rd 42" Concrete Pipe Rehab

JOC for Town of Queen Creek 5,180 LF of new 42" CIPP lining and manhole rehabilitation Pipe cleaning & preparation, PVC lining removal, and sewer bypass pumping Precon services Public outreach and coordination Trenchless technology (HDD) Traffic control

View case →
Phase 1 — Sossaman Water Supply
Town of Queen Creek

Phase 1 — Sossaman Water Supply

JOC for Town of Queen Creek 4,188 LF of new 12" waterline, including 20" HDD bore w/ 12" HDPE carrier pipe Precon services Public outreach and coordination Trenchless technology (HDD) HDPE butt fusion Multi-jurisdictional coordination

View case →
SPA 1 WRF Capacity Expansion
City of Surprise

SPA 1 WRF Capacity Expansion

TFC completed critical infrastructure improvements as part of Felix Construction's capacity expansion project for the City of Surprise's SPA 1 Water Reclamation Facility.

View case →
Hayden 101 (Extended Scope)
Willmeng Construction

Hayden 101 (Extended Scope)

Working with Willmeng Construction to Install approximately of 2700 LF of 16" DIP from just East of N 73rd Place along the Mayo Blvd alignment East past the Miller Road alignment to replace an existing 16" Steel Cylinder Watermain that conflicts with future de

View case →
Primus Liner at Sarival & I-10
City of Goodyear

Primus Liner at Sarival & I-10

Identifying Leak, VE repair options, pulling in place Primus liner and connecting back to water main.

View case →
Estrella Parcel 58 Forcemain Replacement
City of Goodyear

Estrella Parcel 58 Forcemain Replacement

Existing 4" PVC force main removal, replace with new 4" HDPE DR 11,High line bypass diversion off existing sewer lifts stations, and hardscape replacements.

View case →