Projects
Sixteen recent municipal and private utility projects across Arizona — water mains, force mains, pipeline rehabilitation, lift stations, and plant capacity expansions.
19th Ave & Hatcher Urban Art Installation
19th Ave and Hatcher Road Urban Art Installation City of Phoenix TFC recently completed an urban beautification project at the intersection of 19th Avenue and Hatcher Road in Phoenix.
View case →
Hayden 101 Waterline Replacement
Working with Willmeng Construction to Install approximately of 2700 LF of 16" DIP from just East of N 73rd Place along the Mayo Blvd alignment East past the Miller Road alignment to replace an existing 16" Steel Cylinder Watermain that conflicts with future de
View case →
Wastewater Collection System DIP Rehabilitation
Rehabilitation of (22) Ductile Iron Pipe (DIP)segments, involving the installation of CIPP liner into the interior of the pipes.
View case →
Victory Sewer Offsite Sewer
Willmeng Construction Project Cost: $2.366 million Scope:
View case →
Gilbert System Wide Force Main Rehabilitation
Rehabilitation of approximately 22 miles of force mains across 15 lift stations throughout Gilbert.
View case →
Hardy Drive Diversion Manhole Renovation
Awarded through competitive bid with Caliente Construction under City of Tempe General Construction Services JOC.
View case →
Forcemain Repair — Western Canal
Engaged under Town of Gilbert's emergency procurement JOC due to 18" DIP wastewater forcemain failure.
View case →
Tempe Wastewater Collection System
Partnered with Insituform Technologies on a Design-d-Build project for the City of Tempe.
View case →
Peoria Logistics Park
Worked under a General Contractor for the Peoria Logistics Park, a 158-acre industrial park in southern Peoria, Arizona.
View case →
San Tan Lift Station & Force Main Repair
JOC for Town of Gilbert Retrofit / rehab of existing lift station including bypass pumping Precon services from "napkin plans" with GMP Public outreach and coordination MOPO / LOTO coordination Confined space entry HDPE butt fusion welding
View case →
TOQC — Power Rd 42" Concrete Pipe Rehab
JOC for Town of Queen Creek 5,180 LF of new 42" CIPP lining and manhole rehabilitation Pipe cleaning & preparation, PVC lining removal, and sewer bypass pumping Precon services Public outreach and coordination Trenchless technology (HDD) Traffic control
View case →
Phase 1 — Sossaman Water Supply
JOC for Town of Queen Creek 4,188 LF of new 12" waterline, including 20" HDD bore w/ 12" HDPE carrier pipe Precon services Public outreach and coordination Trenchless technology (HDD) HDPE butt fusion Multi-jurisdictional coordination
View case →
SPA 1 WRF Capacity Expansion
TFC completed critical infrastructure improvements as part of Felix Construction's capacity expansion project for the City of Surprise's SPA 1 Water Reclamation Facility.
View case →
Hayden 101 (Extended Scope)
Working with Willmeng Construction to Install approximately of 2700 LF of 16" DIP from just East of N 73rd Place along the Mayo Blvd alignment East past the Miller Road alignment to replace an existing 16" Steel Cylinder Watermain that conflicts with future de
View case →
Primus Liner at Sarival & I-10
Identifying Leak, VE repair options, pulling in place Primus liner and connecting back to water main.
View case →
Estrella Parcel 58 Forcemain Replacement
Existing 4" PVC force main removal, replace with new 4" HDPE DR 11,High line bypass diversion off existing sewer lifts stations, and hardscape replacements.
View case →