Gilbert System Wide Force Main Rehabilitation
Town of GilbertRehabilitation of approximately 22 miles of force mains across 15 lift stations throughout Gilbert.
Project scope
- Extensive Scope:
- Rehabilitation of approximately 22 miles of force mains across 15 lift stations throughout Gilbert.
- Comprehensive Approach:
- Included condition assessment, evaluation of repair methods, and implementation of various rehabilitation techniques.
- Diverse Techniques:
- Utilized open-cut replacement, slip-lining, CIPP, and SIPP based on specific site requirements.
- Wide Range:
- Force main diameters varied from 4-inch to 24-inch, requiring diverse rehabilitation approaches.
- Infrastructure Upgrade:
- Replaced corrodible pipe materials to eliminate failures, increase public safety, and improve sustainability.
- Additional Work:
- Installed new valves and performed recoating where necessary.
- Complex Logistics:
- Managed extensive traffic control and public outreach efforts across multiple sites.
- Operational Continuity:
- Implemented complex bypass pumping scenarios to maintain uninterrupted wastewater service during construction.
- Coordination:
- Worked closely with Town operations to minimize disruptions to service.
- Long-term Impact:
- Significantly enhanced the reliability and longevity of Gilbert's force main system.