TFC — Aurora / ROC-330970 — (602) 909-6995
Gilbert System Wide Force Main Rehabilitation
/v4/projects/ / 005 / gilbert-system-wide-force-main-rehabilitation
// PROJECT 005 · TOWN OF GILBERT

Gilbert System Wide Force Main Rehabilitation

Client
Town of Gilbert
Project №
005
Scope Items
20
Gallery
2 images
License
ROC-330970
Classification
A - General Engineering
  1. Extensive Scope:
  2. Rehabilitation of approximately 22 miles of force mains across 15 lift stations throughout Gilbert.
  3. Comprehensive Approach:
  4. Included condition assessment, evaluation of repair methods, and implementation of various rehabilitation techniques.
  5. Diverse Techniques:
  6. Utilized open-cut replacement, slip-lining, CIPP, and SIPP based on specific site requirements.
  7. Wide Range:
  8. Force main diameters varied from 4-inch to 24-inch, requiring diverse rehabilitation approaches.
  9. Infrastructure Upgrade:
  10. Replaced corrodible pipe materials to eliminate failures, increase public safety, and improve sustainability.
  11. Additional Work:
  12. Installed new valves and performed recoating where necessary.
  13. Complex Logistics:
  14. Managed extensive traffic control and public outreach efforts across multiple sites.
  15. Operational Continuity:
  16. Implemented complex bypass pumping scenarios to maintain uninterrupted wastewater service during construction.
  17. Coordination:
  18. Worked closely with Town operations to minimize disruptions to service.
  19. Long-term Impact:
  20. Significantly enhanced the reliability and longevity of Gilbert's force main system.