/v4/projects/ / 004 / victory-sewer-offsite-sewer
// PROJECT 004 · THE BASE PHASE 1, LLC
Victory Sewer Offsite Sewer
- General Contractor:
- Willmeng Construction Project Cost: $2.366 million Scope:
- Offsite sewer line, manhole installations, and asphalt improvements Sewer Line Installation:
- Installed 1,766 feet of 15" SDR-35 PVC Installed 2,858 feet of 12" SDR-35 PVC Installed 12 EA 60" manholes with 30" ring and cover, coated with insecticide paint and sewer shield Asphalt Replacement:
- Replaced 4,500 square yards of asphalt Additional Services:
- Confined space entry for pipe cleaning and preparation Traffic control and public outreach Multi-jurisdictional coordination