Hardy Drive Diversion Manhole Renovation

Competitive Bid Win: Awarded through competitive bid with Caliente Construction under City of Tempe General Construction Services JOC. High Self-performance: Self-performed over 87% of the project work. Manhole Replacement: Removed and replaced three deteriorated concrete manholes on 24" and 30" sewer lines with two new 72" and 96" corrosion-resistant Armorock Polymer manholes. Hydraulic and Odor Improvements: Enhanced hydraulic characteristics and minimized foul odors on the sewer line. High-traffic Area: Project located at the intersection of Hardy and 17th Place near ASU campus. Sewer Bypass Systems: Installed two sewer bypass systems on 30" and 12" lines, including 24/7 pump-watch, entirely self-performed. Traffic and Public Coordination: Collaborated with City of Tempe for traffic control planning and public outreach, communicating construction impacts to adjacent homeowners. Additional Work: Included pavement removal/replacement, storm drain re-routing, CCTV inspection, air testing, and striping replacement. Timely Completion: Completed the project in less than three weeks to meet holiday traffic restriction requirements.

  1. 01 Competitive Bid Win:
  2. 02 Awarded through competitive bid with Caliente Construction under City of Tempe General Construction Services JOC.
  3. 03 High Self-performance:
  4. 04 Self-performed over 87% of the project work.
  5. 05 Manhole Replacement:
  6. 06 Removed and replaced three deteriorated concrete manholes on 24" and 30" sewer lines with two new 72" and 96" corrosion-resistant Armorock Polymer manholes.
  7. 07 Hydraulic and Odor Improvements:
  8. 08 Enhanced hydraulic characteristics and minimized foul odors on the sewer line.
  9. 09 High-traffic Area:
  10. 10 Project located at the intersection of Hardy and 17th Place near ASU campus.
  11. 11 Sewer Bypass Systems:
  12. 12 Installed two sewer bypass systems on 30" and 12" lines, including 24/7 pump-watch, entirely self-performed.
  13. 13 Traffic and Public Coordination:
  14. 14 Collaborated with City of Tempe for traffic control planning and public outreach, communicating construction impacts to adjacent homeowners.
  15. 15 Additional Work:
  16. 16 Included pavement removal/replacement, storm drain re-routing, CCTV inspection, air testing, and striping replacement.
  17. 17 Timely Completion:
  18. 18 Completed the project in less than three weeks to meet holiday traffic restriction requirements.