Gilbert System Wide Force Main Rehabilitation

Extensive Scope: Rehabilitation of approximately 22 miles of force mains across 15 lift stations throughout Gilbert. Comprehensive Approach: Included condition assessment, evaluation of repair methods, and implementation of various rehabilitation techniques. Diverse Techniques: Utilized open-cut replacement, slip-lining, CIPP, and SIPP based on specific site requirements. Wide Range: Force main diameters varied from 4-inch to 24-inch, requiring diverse rehabilitation approaches. Infrastructure Upgrade: Replaced corrodible pipe materials to eliminate failures, increase public safety, and improve sustainability. Additional Work: Installed new valves and performed recoating where necessary. Complex Logistics: Managed extensive traffic control and public outreach efforts across multiple sites. Operational Continuity: Implemented complex bypass pumping scenarios to maintain uninterrupted wastewater service during construction. Coordination: Worked closely with Town operations to minimize disruptions to service. Long-term Impact: Significantly enhanced the reliability and longevity of Gilbert's force main system.

  1. 01 Extensive Scope:
  2. 02 Rehabilitation of approximately 22 miles of force mains across 15 lift stations throughout Gilbert.
  3. 03 Comprehensive Approach:
  4. 04 Included condition assessment, evaluation of repair methods, and implementation of various rehabilitation techniques.
  5. 05 Diverse Techniques:
  6. 06 Utilized open-cut replacement, slip-lining, CIPP, and SIPP based on specific site requirements.
  7. 07 Wide Range:
  8. 08 Force main diameters varied from 4-inch to 24-inch, requiring diverse rehabilitation approaches.
  9. 09 Infrastructure Upgrade:
  10. 10 Replaced corrodible pipe materials to eliminate failures, increase public safety, and improve sustainability.
  11. 11 Additional Work:
  12. 12 Installed new valves and performed recoating where necessary.
  13. 13 Complex Logistics:
  14. 14 Managed extensive traffic control and public outreach efforts across multiple sites.
  15. 15 Operational Continuity:
  16. 16 Implemented complex bypass pumping scenarios to maintain uninterrupted wastewater service during construction.
  17. 17 Coordination:
  18. 18 Worked closely with Town operations to minimize disruptions to service.
  19. 19 Long-term Impact:
  20. 20 Significantly enhanced the reliability and longevity of Gilbert's force main system.