Victory Sewer Offsite Sewer

// Client: The Base Phase 1, LLC
Victory Sewer Offsite Sewer

General Contractor: Willmeng Construction Project Cost: $2.366 million Scope: Offsite sewer line, manhole installations, and asphalt improvements Sewer Line Installation: Installed 1,766 feet of 15" SDR-35 PVC Installed 2,858 feet of 12" SDR-35 PVC Installed 12 EA 60" manholes with 30" ring and cover, coated with insecticide paint and sewer shield Asphalt Replacement: Replaced 4,500 square yards of asphalt Additional Services: Confined space entry for pipe cleaning and preparation Traffic control and public outreach Multi-jurisdictional coordination

  1. 01 General Contractor:
  2. 02 Willmeng Construction Project Cost: $2.366 million Scope:
  3. 03 Offsite sewer line, manhole installations, and asphalt improvements Sewer Line Installation:
  4. 04 Installed 1,766 feet of 15" SDR-35 PVC Installed 2,858 feet of 12" SDR-35 PVC Installed 12 EA 60" manholes with 30" ring and cover, coated with insecticide paint and sewer shield Asphalt Replacement:
  5. 05 Replaced 4,500 square yards of asphalt Additional Services:
  6. 06 Confined space entry for pipe cleaning and preparation Traffic control and public outreach Multi-jurisdictional coordination