TFC — Aurora / ROC-330970 — (602) 909-6995
Forcemain Repair — Western Canal
/v4/projects/ / 007 / forcemain-repair-western-canal
// PROJECT 007 · TOWN OF GILBERT

Forcemain Repair — Western Canal

Client
Town of Gilbert
Project №
007
Scope Items
14
Gallery
2 images
License
ROC-330970
Classification
A - General Engineering
  1. Emergency Response:
  2. Engaged under Town of Gilbert's emergency procurement JOC due to 18" DIP wastewater forcemain failure.
  3. Immediate Mobilization:
  4. Deployed crews, equipment, and materials within hours, working continuously for 36 hours.
  5. Stabilization and Bypass:
  6. Stabilized the failure site and implemented a 4,100-foot high-line sewer bypass to prevent overflow at Islands Lift Station.
  7. Condition Assessment:
  8. Performed condition assessment of the forcemain while bypass was in place.
  9. Collaboration:
  10. Assisted Town and Hazen Engineering with developing a permanent repair solution.
  11. Permanent Solution:
  12. Trenching and installing a permanent parallel 18" HDPE forcemain across McQueen Road.
  13. Redundancy and Future-proofing:
  14. Designed the new setup to handle existing flows and provide future redundancy.