Contracted under GC
Peoria Logistics Park
Subcontracted Project: Worked under a General Contractor for the Peoria Logistics Park, a 158-acre industrial park in southern Peoria, Arizona. Cost: $1.425 million. Market: Site Utilities. Strategic Location: Near Loop 101 and Grand Avenue (US 60), with easy access to major interstates and 6-9 miles from I-10. Site Readiness: Shovel-ready with existing infrastructure and zoning for industrial use, suitable for semiconductor facilities. Scope: Onsite and offsite utility installations and asphalt improvements for a 155,000 SF tilt-up, build-to-suit distribution facility. Utility Infrastructure: Water, sewer, gas, electric, and communication services adjacent to the property, provided by City of Peoria, Southwest Gas, and CenturyLink. Water Line Installation: Installed 5,361 feet of 4", 6", and 8" DIP. Installed 1 16x8" Tapping Sleeve. Installed 9 8" Gate Valves. Installed 13 6" Gate Valves. Installed 4 4" Gate Valves. Installed 12 Fire Hydrants. Completed 5 Vertical Realignments. Installed 1 Blow Off. Installed 1 4" Backflow. Installed 2 Remote FDCs. Sewer Line Installation: Installed 959 feet of 6" and 8" PVC. Installed 3 48" Manholes. Installed 2 6" Cleanouts. Storm Drain Installation: Installed 111 feet of 18" and 24" HDPE. Irrigation Line Installation: Installed 629 feet of 24" RCP. Installed 1 Irrigation Box. Asphalt Replacement: Replaced 794 square yards of asphalt. Reliable Power Supply: SRP operates a major substation and power generation facility across the street, ensuring steady power. Developer Partnership: The VanTrust Group, developer/partner on the site, facilitates build-to-suit/lease-back facilities.
- Subcontracted Project:
- Worked under a General Contractor for the Peoria Logistics Park, a 158-acre industrial park in southern Peoria, Arizona.
- Cost: $1.425 million.
- Market:
- Site Utilities.
- Strategic Location:
- Near Loop 101 and Grand Avenue (US 60), with easy access to major interstates and 6-9 miles from I-10.
- Site Readiness:
- Shovel-ready with existing infrastructure and zoning for industrial use, suitable for semiconductor facilities.
- Scope:
- Onsite and offsite utility installations and asphalt improvements for a 155,000 SF tilt-up, build-to-suit distribution facility.
- Utility Infrastructure:
- Water, sewer, gas, electric, and communication services adjacent to the property, provided by City of Peoria, Southwest Gas, and CenturyLink.
- Water Line Installation:
- Installed 5,361 feet of 4", 6", and 8" DIP.
- Installed 1 16x8" Tapping Sleeve.
- Installed 9 8" Gate Valves.
- Installed 13 6" Gate Valves.
- Installed 4 4" Gate Valves.
- Installed 12 Fire Hydrants.
- Completed 5 Vertical Realignments.
- Installed 1 Blow Off.
- Installed 1 4" Backflow.
- Installed 2 Remote FDCs.
- Sewer Line Installation:
- Installed 959 feet of 6" and 8" PVC.
- Installed 3 48" Manholes.
- Installed 2 6" Cleanouts.
- Storm Drain Installation:
- Installed 111 feet of 18" and 24" HDPE.
- Irrigation Line Installation:
- Installed 629 feet of 24" RCP.
- Installed 1 Irrigation Box.
- Asphalt Replacement:
- Replaced 794 square yards of asphalt.
- Reliable Power Supply:
- SRP operates a major substation and power generation facility across the street, ensuring steady power.
- Developer Partnership:
- The VanTrust Group, developer/partner on the site, facilitates build-to-suit/lease-back facilities.
Project notes
Plates · Field photography