Estrella Parcel 58 Forcemain Replacement
- Existing 4" PVC force main removal, replace with new 4" HDPE DR 11,High line bypass diversion off existing sewer lifts stations, and hardscape replacements.
- This project includes the removal of the existing 4-inch PVC force main and installation of a new 4-inch HDPE DR11 force main within the existing pipeline alignment.
- To install the new HDPE force main, a temporary high line bypass has been installed to divert existing flows in the neighborhood without any required shutdowns or disruptions to residents.
- Maintaining a seamless new installation while minimizing impacts to the surrounding residents.
- The project also includes hardscape replacements and a final seal coat application.