Extensive Scope: Rehabilitation of approximately 22 miles of force mains across 15 lift stations throughout Gilbert. Comprehensive Approach: Included condition assessment, evaluation of repair methods, and implementation of various rehabilitation techniques. Diverse Techniques: Utilized open-cut replacement, slip-lining, CIPP, and SIPP based on specific site requirements. Wide Range: Force main diameters varied from 4-inch to 24-inch, requiring diverse rehabilitation approaches. Infrastructure Upgrade: Replaced corrodible pipe materials to eliminate failures, increase public safety, and improve sustainability. Additional Work: Installed new valves and performed recoating where necessary. Complex Logistics: Managed extensive traffic control and public outreach efforts across multiple sites. Operational Continuity: Implemented complex bypass pumping scenarios to maintain uninterrupted wastewater service during construction. Coordination: Worked closely with Town operations to minimize disruptions to service. Long-term Impact: Significantly enhanced the reliability and longevity of Gilbert's force main system.

    Project notes

  1. Extensive Scope:
  2. Rehabilitation of approximately 22 miles of force mains across 15 lift stations throughout Gilbert.
  3. Comprehensive Approach:
  4. Included condition assessment, evaluation of repair methods, and implementation of various rehabilitation techniques.
  5. Diverse Techniques:
  6. Utilized open-cut replacement, slip-lining, CIPP, and SIPP based on specific site requirements.
  7. Wide Range:
  8. Force main diameters varied from 4-inch to 24-inch, requiring diverse rehabilitation approaches.
  9. Infrastructure Upgrade:
  10. Replaced corrodible pipe materials to eliminate failures, increase public safety, and improve sustainability.
  11. Additional Work:
  12. Installed new valves and performed recoating where necessary.
  13. Complex Logistics:
  14. Managed extensive traffic control and public outreach efforts across multiple sites.
  15. Operational Continuity:
  16. Implemented complex bypass pumping scenarios to maintain uninterrupted wastewater service during construction.
  17. Coordination:
  18. Worked closely with Town operations to minimize disruptions to service.
  19. Long-term Impact:
  20. Significantly enhanced the reliability and longevity of Gilbert's force main system.